Wave buoy deployment at AMETS A from March 2025 - April 2025

Arna fhoilsiú ag: Marine Institute
Tuairimí: 7
Rátáil oscailteachta:

Deployment of the wave buoy at site AMETS A (54° 16.497' N, 10° 17.847' W) on 15/03/2025. Recovered on 07/04/2025. It was evident after deployment that no vertical heave was being transmitted from the wavebuoy. The buoy was recovered and swapped out with a new buoy. The purpose of this activity is deployment of a wave buoy for ocean energy data collection.

Public Dashboards
No dashboard exists for this dataset.