Residential Commencement Notices

Monthly numbers of commencement notices and units of new residential dwellings. As well as the total number of units and notices the dataset contains the number of units which are one-off/single dwellings, scheme dwellings and apartments. A Commencement Notice is a notification to a Building Control Authority (BCA) that a person intends to carry out works or a Material Change of Use under the Building Regulations. The notice must be given between 14 and 28 days before starting the works or change of use. Once validated by the BCA, works must commence on site within the 28-day period.

For large developments, it is practical to submit a Commencement Notice for each phase, recording the number of units per phase. The Local Government Management Agency (LGMA) operates the Building Control Management System (BCMS) for online Commencement Notice submissions. More information on the BCMS can be obtained from the National Building Control and Market Surveillance Office.

  • Download

Resource: Units Commenced by Main Construction Material

URL: https://opendata.housing.gov.ie/dataset/e06975e1-7d7a-4780-a521-c038a813c339/resource/66edc9c8-71d8-4c1a-ae32-ba8fdb7b57ac/download/dhlgh-commencements-mmc-mat.csv

This resource view is not available at the moment. Click here for more information.

Download resource

Data Dictionary

Column Type Label Description
Metric text Metric
LocalAuthority text LocalAuthority
Main Construction Material text Main Construction Material
May 2025 numeric May 2025
June 2025 numeric June 2025
July 2025 numeric July 2025
August 2025 numeric August 2025
September 2025 numeric September 2025
October 2025 numeric October 2025
November 2025 numeric November 2025
December 2025 numeric December 2025
January 2026 numeric January 2026
Total numeric Total

Additional Information

Field Value
Data last updated 26 January 2026
Metadata last updated 20 February 2026
Created 26 January 2026
Format CSV
License Creative Commons Attribution Share-Alike 4.0
Access urlhttps://opendata.housing.gov.ie/dataset/e06975e1-7d7a-4780-a521-c038a813c339/resource/66edc9c8-71d8-4c1a-ae32-ba8fdb7b57ac/download/dhlgh-commencements-mmc-mat.csv
Datastore activeTrue
Download urlhttps://opendata.housing.gov.ie/dataset/e06975e1-7d7a-4780-a521-c038a813c339/resource/66edc9c8-71d8-4c1a-ae32-ba8fdb7b57ac/download/dhlgh-commencements-mmc-mat.csv
Has viewsTrue
Hash74e70abd9ef10b2685f8cc145b20ce7b
Id66edc9c8-71d8-4c1a-ae32-ba8fdb7b57ac
Mimetypetext/csv
NotesMonthly residential commencement notices (number of units) of new dwellings broken down by main construction Material and dwelling type. The 'None Given' category is where commencement notices were initially submitted through the BCMS prior to the MMC variables being available on the system at the end of April 2025. These figures should be excluded when calculating percentage of MMC. List of permissible materials can be found at https://metadata.housing.gov.ie/item/468/dataelement/housing-construction-material-genre-list
Package ide06975e1-7d7a-4780-a521-c038a813c339
Position2
PreviewTrue
Preview rows2,048
Size138.7 KiB
Stateactive
Superset dataset233
Total record count2,048
Superset Dataset 233
Description Monthly residential commencement notices (number of units) of new dwellings broken down by main construction Material and dwelling type. The 'None Given' category is where commencement notices were initially submitted through the BCMS prior to the MMC variables being available on the system at the end of April 2025. These figures should be excluded when calculating percentage of MMC. List of permissible materials can be found at https://metadata.housing.gov.ie/item/468/dataelement/housing-construction-material-genre-list
High Value Dataset (HVD) Resource No
Applicable Legislation
    API response formats
      API type
      API access url